Next: Microstructure versus time Up: Main Previous: Synthetic 3D initial images

4 Results

This section presents results of simulations made on the CA model and compares them to experimental measurements obtained on real cements. The simulations were performed on a variety of lattices sizes, varying from 64 x 64 x 64 for fast experimentation to 200 x 200 x 200 for the largest runs. A 128 x 128 x 128 system typically took 3­4h for complete hydration on a Sun Sparc 2 workstation*.


*Certain commercial equipment is identified in this paper in order to adequately specify the experimental procedure. In no case does such identification imply recommendation or endorsement by the National Institute of Standards and Technology or Schlumberger Cambridge Research, nor does it imply that the equipment is necessarily the best available for the purpose.